EXPERIENCE
International Testing Pipelines is a specialist for all problems around Cleaning,
Hydrostatic Pressure Testing, Drying and Electronic Geometry Survey of all types of
pipelines. With its large experience has been participating in most important projects of
national and international importance.
1994Client.................... CONSTRUCTORA DELTA - AGROMAN (CHILE) Project................... Gas Pipeline Argentina Chile Scope of work............. 150.000 l.m., Ø 15" Operations/Activity....... Hydrostatic Pressure Testing Client.................... OBRAS Y SERVICIOS HISPANIA, S.A. Project................... Oil Pipeline Coruña - Vigo, Lot I Scope of work............. 80.323 l.m., Ø 10" Operations/Activity ...... Hydrostatic Pressure Testing Client.................... FERPI,S.A. Project .................. Oil Pipeline Coruña - Vigo, Lot II Scope of work ............ 89.675 l.m., Ø 10" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... REPSOL PETROLEO, S.A. Project .................. Aqueduct Jándula - Montoro Scope of work ............ 70.000 l.m., Ø 26" Operations/Activity ...... Polly Pig Pigging with emisor
1995 Client ................... GINES NAVARRO CAPAG, S.A. Project .................. Gas Pipeline Valencia - Alicante, LOT I Scope of work ............ 78.000 l.m., Ø 20" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... ELECNOR, S.A. Project .................. Gas Pipeline Aguilar del Campo Scope of work ............ 21.201 l.m., Ø 2",4",6",16" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... G.S.S.-UTE Project .................. Canal Almodovar Scope of work ............ PK 12 Ø 48" Operations/Activity ...... Particular Hydrostatic Pressure Testing Client ................... DAIP-ENTREPOSE (MAROC) Project .................. Gas Pipeline Maghreb-Europe, Lot A Scope of work ............ 288.372 l.m., Ø 48" Operations/Activity ...... Hydrostatic Pressure Testing,Drying(Extra dry-air) Client ................... AGRUSOLPI, S.L. Project .................. Gas Pipeline Banyoles - Besalú Scope of work ............ 15.951 l.m., Ø 12" ; 15.690 l.m., Ø 8" Operations/Activity ...... Hydrostatic Pressure Testing
1996
Client ................... DAIP-ENTREPOSE (MAROC)
Project .................. Gas Pipeline Maghreb -Europa, Lot A
Scope of work ............ 288.372 l.m., Ø 48"
Operations/Activity ...... CalScan Survey
Client ................... DAIP, S.A.
Project .................. Red de distribución de gas natural en Guipuzcoa
.................. Red de Azpeitia-Zumaia-Usurbil
Scope of work ............ 23.650 l.m., Ø 2,4,6,8"
Operations/Activity ...... Hydrostatic Pressure Testing, Drying
Client ................... DAIP, S.A. (ALGERIA)
Project .................. Oil Pipeline RKF Algeria
Scope of work ............ 110.000 l.m., Ø 20" ; 1.500 l.m., Ø 12"
Operations/Activity ...... Hydrostatic Pressure Testing , Drying
Client ................... DAIPSA/MASA/CYMI, S.A.
Project .................. Gas Pipeline THF-GIJON
Scope of work ............ 33.000 l.m., Ø 6",8"
Operations/Activity ...... Hydrostatic Pressure Testing,Drying (Inertisation N2)
Client ................... CUBIERTAS Y MZOV, S.A.
Project .................. Gas Pipeline Valencia VS-4
Scope of work ............ 66.000 l.m., Ø 2",4",6",8",10",12"
Operations/Activity ...... Hydrostatic Pressure Testing, Drying
Client ................... CUBIERTAS Y MZOV, S.A.
Project .................. Gas Pipeline Córdoba - Jaén - Granada
Scope of work ............ 117.000 l.m., Ø 10",16"
Operations/Activity ...... Hydrostatic Pressure Testing,Drying (Inertisation N2)
Client ................... CONSORCIO D.A.R.T.A. (PORTUGAL)
Project .................. Gas Pipeline Leiria-Campo Maior, Lot A
Scope of work ............ 219.000 l.m., Ø 28"
Operations/Activity ...... Hydrostatic Pressure Testing, CalScan Survey, Drying (Extra dry-air)
Client ................... DAIP, S.A.
Project .................. Gas Pipeline "Ampliación Semianillo de Madrid"
Scope of work ............ 39.238 l.m., Ø 26"
Operations/Activity ...... Hydrostatic Pressure Testing ,Cal Scan Survey, Drying
Client ................... OCP-BONATTI
Project .................. Gas Pipeline Tarifa - Córdoba ,Tramo III
Scope of work ............ 83.000 l.m., Ø 48" ;19.000 l.m., Ø 36
............ Equipment renting for hydrostatic pressure testing
Operations/Activity ...... Hydrostatic Pressure Testing
Client ................... OCP-BONATTI
Project .................. Gas Pipeline Córdoba - Badajoz frontera con Portugal
.................. Tramo I, 105.000 l.m., Ø 32"
Scope of work ............ Equipment renting for hydrostatic pressure testing
Operations/Activity ...... Hydrostatic Pressure Testing
1997 Client ................... FERROGHIZZONI ESPAÑA, S.A. Project .................. Gas Pipeline "VALENCIA - ALICANTE, LOT II" Scope of work ............ 113.000 l.m., Ø 30" Operations/Activity ...... Hydrostatic Pressure Testing , Drying Client ................... REPSOL-ENAGAS Project .................. Gas Pipeline "VALENCIA - ALICANTE, LOT II" Scope of work ............ 113.000 l.m., Ø 30" Operations/Activity ...... CalScan Survey Client ................... CONSORCIO D.A.R.T.A.(PORTUGAL) Project .................. Gas Pipeline -"SETÚBAL" Scope of work ............ Ø 28", 16" Operations/Activity ...... Particular Hydrostatic Pressure Testing Client ................... AGROMAN Project .................. Gas Pipeline -"VILLALBA-TUY, LOT I" Scope of work ............ 126.000 l.m. , Ø 20" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... CONSORCIO CONDACOL (COLOMBIA) Project .................. Gas Pipeline -"CENTRO ORIENTE" Scope of work ............ 600.000 l.m. , Ø 12", 14", 22". Operations/Activity ...... Drying (Extra dry Air, Dew Point -10ºC) Client ................... NECSO Project .................. Gas Pipeline -"VILLALBA-TUY, LOT II" Scope of work ............ 85.272 l.m. , Ø 20". Operations/Activity ...... Hydrostatic Pressure Testing Client ................... ARAZA - U.T.E. -OSHSA-SICIM, S.p.A. Project .................. Gas Pipeline -"ARANDA-ZAMORA, LOT I & II" Scope of work ............ 164.599 l.m. , Ø 20". Operations/Activity ...... Hydrostatic Pressure Testing Client ................... OSHSA Project .................. RAMAL A TOLEDO, 2ND. FASE Scope of work ............ 4.000 l.m. , Ø8", 730 Ø6". Operations/Activity ...... Hydrostatic Pressure Testing Client ................... FERPI, S.A. Project .................. Gas Pipeline "RAMAL A JEREZ" Scope of work ............ 45.450 l.m. , Ø2",4",10",12",16" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... ELECNOR,S.A. Project .................. Gas Pipeline "SALIDA AS-3 & AS-4 ALICANTE" Scope of work ............ 45.450 l.m. , Ø 2", 4", 6", 8" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... DAIP,S.A. Project .................. "CRUCE RIO LLOBREGAT" Scope of work ............ 322 l.m. , Ø 24" ; 341 l.m. Ø 16" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... ABRANTINA (PORTUGAL) Project .................. PROJECT P-12 RAMAIS INDUSTRIAIS-RN04 Scope of work ............ 2.000 l.m. , Ø 6" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... NECSO Project .................. Gas Pipeline - "LLANERA - NAVIA" Scope of work ............ 89.950 l.m. , Ø 20" ; 950 l.m. , Ø 12" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... ELECNOR , S.A. (PORTUGAL) Project .................. PROJECT P-012 RAMAIS INDUSTRIAIS Scope of work ............ 15.500 l.m. , Ø 6",4" Operations/Activity ...... Hydrostatic Pressure Testing and Drying (Extra dry air-dew point- 20ºC)
1998 Client ................... TEHISA, S.A. (PORTUGAL) Project .................. Gas Pipeline - "RAMAL RL-02 ELENQUER" Scope of work ............ 3.316 l.m. , Ø 6",4" Operations/Activity ...... Drying - Extra dry air - dew point - 20ºC Client ................... APL - FCC , S.A. Project .................. RAMAL A SARRIO PAPEL - ZARAGOZA Scope of work ............ 5.330 l.m. , Ø 8" Operations/Activity ...... Hydrostatic Pressure Testing and Drying (Extra dry air-dew point- 20ºC) Client ................... DAIP-VISABEIRA (PORTUGAL) Project .................. RAMAL RL-01 TORRES VEDRAS Scope of work ............ 12.000 l.m. , Ø 8", 6", 4" Operations/Activity ...... Drying (Extra dry air - dew point - 15ºC) Client ................... AGROMAN Project .................. Gas Pipe Line "VILLALBA - TUY, LOT I" Scope of work ............ 126.000 l.m. , Ø 20" Operations/Activity ...... CalScan Survey Client ................... DAIP, S.A. Project .................. Gas Pipe Line "LLANERA - VILLALBA, LOT II" Scope of work ............ 91.500 l.m. , Ø 20" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... U.T.E. GAS VIGO - OCP - BONATTI Project .................. Gas Pipe Line "PORRIÑO - VIGO" Scope of work ............ 43.000 l.m. , Ø 14",10",8",6",4",2" Operations/Activity ...... Hydrostatic Pressure Testing Client ................... AUXIMET, S.A. Project .................. Gas Pipe Line "Red de Orense, Santiago y Pontevedra" Scope of work ............ 2.500 l.m. Ø 8" ; 14.000 l.m. Ø 6" Operations/Activity ...... Hydrostatic Pressure Testing
1999
Client ................... GISCA
Project .................. Ramal y Red de Talavera de la Reina
Scope of work ............ 63.000 l.m. ; Ø 10",8",6",4"
Operation ................ Hydrostatic Pressure Testing, Drying with
extra dry air and Cal Scan Survey
Client ................... COPISA
Project .................. Oil Pipeline Terquimsa - SHELL
Scope of work ............ 5.050 l.m. ; Ø 6"
Operation ................ Hydrostatic Pressure Testing and
Drying with extra dry air -35ºC D.P.
Client ................... ABERDEEN
Project .................. Salida Gaseoducto a Salamanca
Scope of work ............ 500 l.m. ; Ø 26"
Operation ................ Hydrostatic Pressure Testing
Client ................... U.T.E. DAIP-MONTEZ-CONEQUIPOS (COLOMBIA)
Project .................. POLIDUCTO DE ORIENTE
Scope of work ............ Ø 16"
Operation ................ Compressors + Pig Locator System Renting
Client ................... CONSORCIO VISABEIRA-DYCTEL-DAIP (PORTUGAL)
Project .................. Gas Pipeline Portalegre - Guarda Lote 5B
Scope of work ............ 97.000 l.m. ; Ø 12"
Operation ................ Hydrostatic Pressure Testing and
Drying with extra dry air
Client ................... CONSORCIO TENENGE - DAIP (BRASIL)
Project .................. Gas Pipeline Bolivia - Brasil Tramo IX XII
Scope of work ............ 500.000 l.m. ; Ø 26" y 16"
Operation ................ Hydrostatic Pressure Testing and
Drying with extra dry air
Client ................... ABERDEEN
Project .................. Gas Pipeline Ramal 2 - Redes de Murcia
Scope of work ............ 13.000 l.m. ; Ø 4",6" y 12"
Operation ................ Hydrostatic Pressure Testing
Client ................... APL - FCC
Project .................. Oil Pipeline Cartagena - Puertollano Tramo I
Scope of work ............ 88.900 l.m. ; Ø 22"
Operation ................ Hydrostatic Pressure Testing and
Drying with extra dry air
Client ................... UTE LA MANCHA (OSHSA-SICIM,SpA)
Project .................. Oil Pipeline Cartagena-Puertollano
Tramo III,IV
Scope of work ............ 176.168 l.m. ; Ø 22"
Operation ................ Hydrostatic Pressure Testing and
Drying with extra dry air
Client ................... G.V.S. UTE (GINES NAVARRO, CAPAG.SA , VIAS
Y CONSTRUCCIONES, SA, SPIE CAPAG,SA )
Project .................. Gas Pipeline Leon - Oviedo
Scope of work ............ 112.525 l.m. ; Ø 20"
Operation ................ Hydrostatic Pressure Testing and
Drying with extra dry air
Client ................... CLH
Project .................. Oil Pipeline Puertollano - Almodovar
Scope of work ............ 14.420 l.m. ; Ø 10"
Operation ................ Hydrostatic Pressure Testing and
Drying with extra dry air
Client ................... CLH
Project .................. Oil Pipeline Loeches - Villaverde
Scope of work ............ 26.470 l.m. ; Ø 10"
Operation ............... Hydrostatic Pressure Testing
Client ................... ACS BONATTI
Project .................. Gas Pipeline CORDOBA-BADAJOZ
"Variante de Cordoba"
Scope of work ............ 1.037 l.m. ; Ø 32"
Operation ................ Hydrostatic Pressure Testing
Client .................. DAIP
Project ................. Gas Pipeline Red de Elgoibar- Zestoa Fase I
Scope of work ........... 10.240 l.m. ; Ø 4,8
Operations/Activities .... Hydrostatic Pressure Testing,
Drying with extra dry air (-20ºC D.P.)
2.000Client .................. CONSORCIO TENENGE DAIP (BRASIL) Project ................. Gas Pipeline Bolivia - Brasil Lot IX y XIII Scope of work ........... 500.000 l.m. ; Ø 24 y Ø 16 Operations/Activities ... CalScan Survey Client .................. GUINOVART & OSHSA Project ................. Gas Pipeline Tercer Cinturón de Barcelona Scope of work ........... 32.000 l.m. ; Ø 20 Operations/Activity ..... Hydrostatic Pressure Testing, Drying with extra dry air (-20ºC D.P.) Magnetic pigs running with extra dry air Client .................. MONTAJES ANGERIZ, S.A. Project ................. Gas Pipeline Variante Ronda Hispanidad Scope of work ........... 2.000 m.l. ; Ø 20 Operations/Activity ..... Hydrostatic Pressure Testing Client .................. ELECNOR Project ................. Gas Pipeline Salida VS-7 Scope of work ........... 12.000 l.m. ; Ø 8, 4 Operations/Activity ..... Hydrostatic Pressure Testing, Drying with extra dry air (-20ºC D.P.) Client .................. APL -FCC Project ................. Oil Pipeline Cartagena Puertollano Lot I Scope of work............ 88.900 l.m. ; Ø 22 Operations/Activities.... CalScan Survey Client .................. AGROMAN Project ................. Oil Pipeline Cartagena Puertollano Lot II Scope of work ........... 87.550 l.m. ; Ø 22 Operations/Activities ... CalScan Survey Client .................. U.T.E. LA MANCHA (OSHSA SICIM,SpA) Project ................. Oil Pipeline Cartagena Puertollano Lot III & IV Scope of work ........... 176.168 l.m. ; Ø 22 Operations/Activities ... CalScan Survey Client .................. DAIP Project ................. Proyecto de conducción y suministro de gas Natural Móra dEbre Móra la Nova Scope of work ........... 4.000 l.m. ; Ø 4,6 Operations/Activities ... Hydrostatic Pressure Testing Client .................. UTE GAS LLIRIA (ACS-BONATTI) Project ................. Gas Pipeline Salida VS-5 y VS-6 Scope of work ........... 30.000 l.m. ; Ø 8,6, 4 Operations/Activities ... Hydrostatic Pressure Testing, Drying with extra dry air (-20ºC D.P.) Client .................. DAIP Project ................. Gas Pipeline Red de Elgoibar- Zestoa Fase II Scope of work ........... 8.200 l.m. ; Ø 8 Operations/Activities ... Hydrostatic Pressure Testing Client .................. CLH Project ................. Pantalan de Barcelona Línea JET A-1 Scope of work ........... 2.000 l.m. ; Ø 20 Operations/Activity ..... Hydrostatic Pressure Testing Client .................. CHALENGER (FRANCE) Project ................. Gas Pipeline Moussy Fontenay y Mauvoisin Scope of work ........... 32.400 l.m. ; Ø 36 Operations/Activities ... Hydrostatic Pressure Testing Client .................. ACS BONATTI Project ................. Gas Pipeline Valencia-Alicante, Desdoblamiento del Tramo I Scope of work ........... 89.827 l.m. ; Ø 24 Operations/Activity ..... Hydrostatic Pressure Testing, Drying with extra dry air Kaliper pig Survey Client .................. AUXILIAR DE PIPE LINES, S.A. Project ................. Oil Pipeline Loeches - Guadalajara Scope of work ........... 40.480 l.m. ; Ø 10 Operations/Activity ..... Hydrostatic Pressure Testing Client .................. UTE ELEUNI (ELECNOR IMPRESA UNIONE, S.P.A.) Project ................. Gas Pipeline Semianillo Noroeste de Madrid Scope of work ........... 55,359 l.m. - Ø 16 ; 2.404 l.m. Ø 20 Operations/Activity ..... Hydrostatic Pressure Testing, Drying with extra dry air Kaliper pig Survey Client ................. GUINOVART&OSHSA Project ................ Fuel pipe lines of CLH CLH Factory of Tarragona Scope of work .......... 12.000 l.m. ; Ø 10 Operations/Activity .... Hydrostatic Pressure Testing Client ................. CLH Compañía Logística de Hidrocarburos CLH, S.A. Project ................ CLH Factory Port of Tarragona Scope of work .......... 4.000 l.m. Ø 6 ; 4.000 l.m. Ø 10 Operations/Activity .... Cleaning with Stainless steel brushes pigs Client ................. SEMI SERVICIOS , S.A. Project ................ Gas Pipeline Torrefarrera - Aplicat Scope of work .......... 5.000 l.m. Ø 12; Ø 8 Operations/Activity .... Drying with extra dry air Client ................. SEMI SERVICIOS , S.A. Project ................ Gas Pipeline Osuna Scope of work .......... 9.900 l.m. Ø 6; Ø 4 Operations/Activity .... Drying with extra dry air Client ................. CLH Compañía Logística de Hidrocarburos CLH, S.A. Project ................ Oil Pipeline Torrejón - Loeches Scope of work .......... 7.000 l.m. Ø 10; 7.000 l.m. Ø 12 Operations/Activity .... Pressure testing Client ................. CLH Compañía Logística de Hidrocarburos CLH, S.A. Project ................ Oil pipeline Loeches - Barajas Scope of work .......... 19.200 l.m. Ø 10 Operations/Activity .... Pressure testing Client ................. REPSOL YPF Project ................ Oil Pipeline Tarragona Lleida - Zaragoza Scope of work .......... 13.500 l.m. Ø 10 Operations/Activity .... Deactivation and dewatering (pumping with nitrogen) Client ................. REPSOL YPF Project ................ Oil Pipeline Rota - Zaragoza Scope of work .......... 58.000 l.m. Ø 8 Operations/Activity .... Deactivation and dewatering (pumping with nitrogen) Client ................. REPSOL YPF Project ................ Oil Pipeline Loeches - Villaverde Scope of work .......... 8.200 l.m. Ø 10 Operations/Activity .... Deactivation and dewatering (pumping with nitrogen) Client ................. GUINOVART&OSHSA Project ................ Gas Pipeline La Roca del Vallès - Argentona Scope of work........... 6.800 l.m. Ø 10 ; 4.600 m.l. Ø 12 Operations/Activity .... Hydrostatic Pressure Testing, Drying with extra dry air Client ................. G.V. GRANADA U.T.E. (GISCA VIAS Y CONSTRUCCIONES) Project ................ Gas Pipeline Granada - Motril Scope of work .......... 68.300 l.m. Ø 10 Operations/Activity .... Hydrostatic Pressure Testing, Kaliper pig Survey
2.001Client ............... REPSOL YPF Project .............. Oil Pipeline Loeches - Villaverde Scope of work......... 8.200 l.m. Ø 10 Operations/Activity .. Deactivation and dewatering (pumping with nitrogen) Client ............... GUINOVART & OSHSA Project .............. Gas Pipeline Red Deba Mutriku Ondarroa Scope of work ........ 12.000 l.m. Ø 4; 6 Operations/Activity .. Hydrostatic Pressure Testing Client ............... CLH Compañía Logística de Hidrocarburos CLH, S.A. Project .............. Pantalán de Barcelona Scope of work ........ Line 16 IFO - TN Operations/Activity .. Dewatering and cleaning of pipeline