Gamesa

  Barra de men˙ 

 2011. Possible prototip de Gamesa pel projecte ZŔfir el G11X - 5 MW

 


 2013. Tecnologia Gamesa G128 - 5.0 MW. Primer prototip offshore a CanÓries.



Font: http://www.offshorewind.biz/2013/05/28/gamesa-assembles-spains-first-prototype-offshore-wind-turbine/

Font: http://www.offshorewind.biz/2013/10/16/spain-ges-installs-gamesas-5mw-wind-turbine/


Font: http://www.offshorewind.biz/2013/04/12/spain-gamesa-marks-further-progress-on-its-offshore-strategy/

 2011. Tecnologia Gamesa G10X - 4,5 MW. Primer prototip onshore a JaulÝn (Saragossa).


 2011. Tecnologia Gamesa G10X - 4,5 MW

Font: http://www.gamesacorp.com/es/

Tecnologia Gamesa G11X - 5 MW

Gamesa G11X - 5 MW

Tecnologia Gamesa G14 - 7 MW

EstÓ prevista aquesta tecnologia pel 2015